01 Meridian Rail Operational identity 2025

Signal Atlas

Meridian moves 1.2 million people a day across four countries. Its control rooms read the network as a timetable; its customers read it as a map. We were asked to give both the same picture.

Meridian Rail · 2025

At a glance

Client Meridian Rail AG
Year 2025
Scope Identity, data language, control interface
Duration 16 weeks
Team 4 Nullpunkt · 2 Meridian

The problem was scale, not style

Meridian had eleven visual systems, one per region, and a control interface that had grown by accretion since 2009. The brief said "brand refresh". The actual problem was that nobody could compare two regions on one screen without translating units, colours and symbols in their head.

We proposed the opposite of a refresh: one construction rule. Every line on every surface is drawn from the same polar grid, centred on the network centroid. Track, delay, platform occupancy and rolling stock all use the same radial distance scale, so a reader learns one geometry and can then read everything.

Computed live
Plate 01 — Network centroid grid. Radial distance is travel time, not geography.

One ink, one signal

The palette collapsed to warm paper, velvet graphite and a single signal vermilion. Vermilion is reserved for exactly one meaning: a segment that is currently failing. Nothing decorative may use it, which is enforced in code — the drawing engine refuses the accent token outside the fault layer.

Type moved to Inter for the interface and Geist Mono for anything a controller copies into a log or a phone call. Numbers are tabular everywhere, so a column of times stops jittering when it updates.

Computed live
Plate 02 — Platform occupancy matrix at 07:40. Vermilion marks segments over threshold.

“We stopped arguing about colours in week three, because there was only one left to argue about.”

Head of Operations, Meridian Rail
1.2M journeys a day covered by the system
4,900 kilometres of track on one scale
38% faster fault localisation in trials

What shipped

  • Identity system: logotype, timetable grid, motion rules, 48-page specification
  • Control interface: one layout, four countries, live since March 2025
  • Customer map: same geometry, reduced to three layers for public use
  • Engine handover: 6,200 lines of documented drawing code, running in production

Credits

Direction
A. Vogt · M. Ferreira
Design
L. Brunner · S. Okada
Engineering
M. Ferreira
Client lead
Meridian Operations
08 Contact
Replies within two working days

A paragraph about the system you need explained is enough to start.