Signal Atlas
Meridian moves 1.2 million people a day across four countries. Its control rooms read the network as a timetable; its customers read it as a map. We were asked to give both the same picture.
At a glance
The problem was scale, not style
Meridian had eleven visual systems, one per region, and a control interface that had grown by accretion since 2009. The brief said "brand refresh". The actual problem was that nobody could compare two regions on one screen without translating units, colours and symbols in their head.
We proposed the opposite of a refresh: one construction rule. Every line on every surface is drawn from the same polar grid, centred on the network centroid. Track, delay, platform occupancy and rolling stock all use the same radial distance scale, so a reader learns one geometry and can then read everything.
One ink, one signal
The palette collapsed to warm paper, velvet graphite and a single signal vermilion. Vermilion is reserved for exactly one meaning: a segment that is currently failing. Nothing decorative may use it, which is enforced in code — the drawing engine refuses the accent token outside the fault layer.
Type moved to Inter for the interface and Geist Mono for anything a controller copies into a log or a phone call. Numbers are tabular everywhere, so a column of times stops jittering when it updates.
“We stopped arguing about colours in week three, because there was only one left to argue about.”
Head of Operations, Meridian RailWhat shipped
- Identity system: logotype, timetable grid, motion rules, 48-page specification
- Control interface: one layout, four countries, live since March 2025
- Customer map: same geometry, reduced to three layers for public use
- Engine handover: 6,200 lines of documented drawing code, running in production
Credits
- Direction
- A. Vogt · M. Ferreira
- Design
- L. Brunner · S. Okada
- Engineering
- M. Ferreira
- Client lead
- Meridian Operations